The construction of the Babica tunnel near Rzeszów is entering a groundbreaking phase. The first tunnel has been successfully completed, and the team has begun the next stage – the precise reversal of the TBM. This is one of the most demanding stages of the entire project, involving the dismantling of key modules, including the cutting disc, and their relocation to the assembly station for the second tunnel.
To ensure the highest efficiency and safety of operations, the innovative Airmover system was utilized. This technology allows for the smooth and highly precise movement of heavy items, maintaining complete control over every step of the process. This allows work to be carried out even in particularly difficult and confined spaces – without compromising safety or schedule.
The entire operation was carried out in compliance with rigorous quality standards and with the participation of experienced technical teams. It is an example of how advanced technological resources and a professional approach enable the implementation of strategic infrastructure investments.
Projects like these confirm that appropriate technologies and know-how are the foundation of effective, predictable, and safe projects. This sends a clear message to investors: collaborating with an experienced partner provides a real advantage – both in terms of efficiency and the final outcome of the project.
